Help CenterLearn AdminEnterprise: Configure and manage Rival LearnOrganizationCertification TypesCertification Type Properties page
Fixed Period certification calculations
A Fixed Period Recertification is shown in the following example. Note that the:
- Base Due Date is 31 May 2009
- Recertification Period is 1 year
- Reactivation Period is 60 days

Mastered content scenarios
Let’s say that current Due Date is A (31 May 13). In this scenario:
- If a user completes the content within the Required Mastery Range (between Reactivation Start Date A and Reactivation Start Date B), the next Due Date becomes B (31-May-14).
- Multiple mastery records of the same or equivalent content, within the same Required Mastery Range, do not modify the Due Date. Due Date remains B (31-May-14).
- If user completes the content or an equivalent in the next Required Mastery Range (between Reactivation Start Date B and Reactivation Start Date C), the next Due Date becomes C (31-May-15).